Infrastructure
Are Mijas beaches open for Easter 2026? Repair updates for coastal path and sand replenishment
José Carlos García | Mijas
Town hall to replenish 14,000 cubic metres of sand at El Bombo, Calahonda, and Las Doradas ahead of Easte and repair the damaged section of the coastal path at El Capricho