surinenglish

Ventura del Mar beach drains to be removed

Ventura del Mar.
Ventura del Mar. / C. M.
  • A budget of 477,562 euros has been set aside for the San Pedro beach

A budget of 477,562 euros has been set aside by the western Costa water authorities to remove 380 metres of drains and seven manhole covers from Ventura del Mar beach in San Pedro.

This is part of a bid to improve the image of the area and to reduce the risk of any leakages in the future.